Preparation of construction of preinsulated district heating networks in PE-HD casing laid directly in the ground. Part III

Authors

  • Ewa Kręcielewska Veolia Energia Warszawa S.A Author
  • Artur Starobrat LPEC Lublin Author
  • Ireneusz Iwko Logstor Polska Author

DOI:

https://doi.org/10.36119/15.2025.9.1

Keywords:

preinsulated district heating networks, design documentation

Abstract

A high quality of the investment related to the construction and subsequent operation of district heating pipelines is ensured by performing it on the basis of properly developed project documentation, which:‒ should contain all the information required for roper execution of the works,‒  be sufficiently detailed to ensure that the construction project can be carried out in accordance with the assumed and expected quality. After the investment is completed, detailed post-construction documentation should be prepared. The article describes the necessary work and its scope, enabling the preparation of correct design documentation for a pre-insulated 
heating network.

Downloads

Download data is not yet available.

References

USTAWA z dnia 7 lipca 1994 r. Prawo budowlane

Rozporządzenie Ministra Rozwoju z dnia 11 września 2020 r. w sprawie szczegółowego zakresu i formy projektu budowlanego

Hanna Bindarowska, Wybrane zagadnienia z projektowania sieci ciepłowniczych preizolowanych, prezentacja Radpol 07.02.2023

Downloads

Published

2025-09-30

Issue

Section

Artykuły

Categories

How to Cite

Kręcielewska, E., Starobrat, A., & Iwko, I. (2025). Preparation of construction of preinsulated district heating networks in PE-HD casing laid directly in the ground. Part III. Instal, 9, 15-24. https://doi.org/10.36119/15.2025.9.1

Most read articles by the same author(s)