Preparation of construction of preinsulated district heating networks in PE-HD casing laid directly in the ground. Part I
DOI:
https://doi.org/10.36119/15.2025.5.3Keywords:
preinsulated district heating networks, design documentation, constructionAbstract
A high quality of the investment related to the construction and subsequent operation of district heating pipelines is ensured by performing it on the basis of properly developed project documentation, which: should contain all the information required for proper execution of the works, be sufficiently detailed to ensure that the construction project can be carried out in accordance with the assumed and expected quality. After the investment is completed, detailed post-construction documentation should be prepared. The article describes the necessary work and its scope, enabling the preparation of correct design documentation for a pre-insulated heating network.
Downloads
References
USTAWA z dnia 7 lipca 1994 r. Prawo budowlane
Rozporządzenie Ministra Rozwoju z dnia 11 września 2020 r. w sprawie szczegółowego zakresu i formy projektu budowlanego
Hanna Bindarowska, Wybrane zagadnienia z projektowania sieci ciepłowniczych preizolowanych, prezentacja Radpol 07.02.2023
Downloads
Published
License

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors retain copyright and grant the journal the right of first publication, with the work simultaneously licensed under a Creative Commons Attribution 4.0 International License, which permits others to share the work with appropriate acknowledgment of the authorship and initial publication in this journal.

