Żarski, Kazimierz, and Mariusz Kryża. 2022. “Conditions for the Correct Cooperation of the District Heating Substation With the Air Conditioning System of the Operating Blocks in a Hospital”. Instal, no. 3 (March): 5-10. https://doi.org/10.36119/15.2022.3.1.