1.
Laskowski R, Smyk A, Rusowicz A, Grzebielec A, RuciƄski A. Verification of the selection of the diameter of the steam condenser tube for a 200 MW unit. Instal. 2022;(2):11-15. doi:10.36119/15.2022.2.2